English
עברית
HOME
Laying of the national gas line
Project INGL Line 36″-Aroar-Dimona
INGL project line 36″- K. Gat – Shikma – Shuvel
Project INGL Line 24″-Orot Rabin Hadera
Energy Infrastructures line project 12″ – functional continuity
Branching stop live line HT
Projects execution and renovation of industrial facilities
Industrial storage tanks and steel constructions
Fuel and liquid line renovation installations
Integrated civil engineering works
Horizontal drillings under the infrastructures
Accessibility statement
Certificates and standards
Contact
Facebook
Ts”a line project 12″ – functional continuity
Welding tents and piping connection
Distribution of pipes in the route
Lowering the pipe to the excavation
The connected pipe before burial
The connected pipe before burial
Inspections while lowering the pipe to the canal
Lowering the pipe to the excavation
Construction of valve structure and inspection
Construction of valve structure and inspection
Connection between an existing pipe and a new pipe
Covering the piping in the trench with sand and concrete slabs
The pipe is in a trench on a sand bed
Horizontal drilling machine
203 Histadrut Ave.
Haifa-Bay
972-4-8720914
972-54-5242269
keren@hzr.co.il
An article in the Haifa Times
Accessibility statement
Website development -> Fidus