• Carrying out the installation of the national natural gas pipeline for industry.
  • Production and installation of stations and gas lines.
  • Laying gas and fuel lines.
  • Construction of main fuel gas lines and gas distribution stations according to strict European standards in cooperation with European companies and under the supervision of GHIZZONI COMPANY, the entire work is carried out according to the requirements of the Dutch standard, which is the strictest European standard for gas piping work. The natural gas pipeline is designed to transport the gas from the drilling site in the Tethys Sea and Egypt to industrial plants throughout the country and to replace the fuel oil that is used as the main energy supplier today
Company presentation
GAZ PIPE LINE PROJECT

Construction of inspection stations and

valves along the national gas transportation line

Valve inspection station

valve station
valve station
Valve inspection station
Valve inspection station
Valve
Valve
Pipe bending machine
Pipe bending machine
facing machin
facing machin

Inspection of welds
Inspection of welds

203 Histadrut Ave.
Haifa-Bay

972-4-8720914
972-54-5242269

keren@hzr.co.il

Website development -> Fidus